Table of Contents
Table 1a. Bed sediment and tissue sampling in the LINJ, through FY 1997.
Table 2. Basic Fixed Site sampling in the LINJ, through FY 1997.
Table 3a. Intensive Fixed Site sampling Bound Brook at Middlesex, through FY 1997.
Table 3b. Intensive Fixed Site sampling Great Egg Harbor River at Sicklerville, through FY 1997.
Table 3c. Intensive Fixed Site sampling Raritan River at Queens Bridge, through FY 1997.
Table 1a. Bed sediment and tissue sampling in the LINJ study unit,
accomplishments through FY 1997-98.
----------------------------------------------------------------------
# # # #
Bed Tissues Target Indicator Integrator
Sediment Taxa Sites Sites
----------------------------------------------------------------------
Trace Elements 14 8 White Sucker 7 1
Creek Chubsucker 1 0
Organochlorines 14 8 White Sucker 7 1
Creek Chubsucker 1 0
----------------------------------------------------------------------
Footnotes
1 All fixed sites were electrofished for cllection of target taxa,
no white suckers were captured at our integrator site Passaic River
at Two Bridges. We will attempt capture during low flow in FY98.
2 White sucker were not present at our IFS Great Egg Harbor River at
Sicklerville. Chrrek Chubsucker was chosen as the serogate target taxa
in coordination with NST personnel.
Table 2. Basic Fixed Site sampling in the LINJ study unit, accomplishments through FY 1997.
--------------------------------------------------------------------------------------------------------------------
Hi Flow Repli Total Continuous Measure of 10 or 30 40 or
SUCODE ID Stream Name Started Frequency Samples cates Blanks Samples Flow Conduct. Temp 20 50
--------------------------------------------------------------------------------------------------------------------
fix1, int 01382000 Passaic River 4/96 ~monthly 3 + 5 0 2 17 yes no no
fix1, eco2, irs 01390500 Saddle River 5/96 ~monthly 0 0 1 12 yes no yes
fix1, eco2, iag 01398000 Neshanic River 4/96 ~monthly 2 + 5 1 3 17 yes no yes
fix1, eco2, irs 01401000 Stony Brook 4/96 ~monthly 3 + 5 1 1 18 yes no yes
--------------------------------------------------------------------------------------------------------------------
Table 3a. Intensive Fixed Site sampling in the LINJ study unit, accomplishments through FY 1997.
Sampling frequency (fixed interval samples/event samples) for urban site (fix2, eco2, iur) 01403900 Bound Brook at Middlesex.
--------------------------------------------------------------------------------------------------------------------------------------
Sample Type Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
--------------------------------------------------------------------------------------------------------------------------------------
Pesticides SC 2001 1996 2 4 3/1 1/1 2 1/1 17
1997 1/1 1 1 0/1 1 1 3/1 1/1 1/2 2/2 2 1 23
Pesticides SC 2050 1996 1 4 3/1 1/1 2 1/1 15
1997 1/1 1 1 0/1 1 1 3/1 1/1 0/2 2/2 2 1 22
VOCs SC 2020 1996 2 4 3/1 1/2 2 1/1 17
1997 2/1 1 1/1 2/1 1 2 1/1 1 0/1 1/2 1 1 21
Nutrients 1996 2 4 3/1 1/2 2 1/1 17
1997 1/1 1 1 1/1 2 2 3/1 1/1 1/2 2/2 2 1 26
Suspended Sediment 1996 2 4 3/1 1/2 2 1/1 17
1997 1/1 1 1 1/1 2 2 3/1 1/1 1/2 2/2 2 1 26
Suspended Organic Carbon 1996 2 4 3/1 1/2 2 1/1 17
1997 1/1 1 1 1/1 2 2 3/1 1/1 1/2 2/2 2 1 26
Dissolved Organic Carbon 1996 2 4 3/1 1/2 2 1/1 17
1997 1/1 1 1 1/1 2 2 3/1 1/1 1/2 2/2 2 1 26
Dissolved Solids 1996 2 4 3/1 1/2 2 1/1 17
1997 1/1 1 1 1/1 2 2 3/1 1/1 1/2 2/2 2 1 26
Temperature 1996 hourly hourly hourly
1997 hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly
Conductance 1996 hourly hourly hourly
1997 hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly
--------------------------------------------------------------------------------------------------------------------------------------
Table 3b. Intensive Fixed Site sampling in the LINJ study unit, accomplishments through FY 1997.
Sampling frequency (fixed interval samples/event samples) for increasing urbanization site (fix2, eco1, iur) 01410784 Great Egg Harbor River at Sicklerville.
-----------------------------------------------------------------------------------------------------------------------------------
Sample Type Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
-----------------------------------------------------------------------------------------------------------------------------------
Pesticides SC 2001 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 1 1 0/1 3/1 2 2 3 2 1 21
Pesticides SC 2050 1996 1 4 4 2/1 1 2 15
1997 0/2 1 0/1 1 1 0/1 3/1 2 1 3 2 1 20
VOCs SC2020 1996 1 4 4 2/1 1 2 15
1997 0/2 1 0/1 3 1 1/1 1/1 1 1 1 1 1 17
Nutrients 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 2 2 1/1 3/1 2 2 3 2 1 24
Suspended Sediment 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 2 2 1/1 3/1 2 2 3 2 1 24
Suspended Organic Carbon 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 2 2 1/1 3/1 2 2 3 2 1 24
Dissolved Organic Carbon 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 2 2 1/1 3/1 2 2 3 2 1 24
Dissolved Solids 1996 2 4 4 2/1 1 2 16
1997 0/2 1 0/1 2 2 1/1 3/1 2 2 3 2 1 24
Temperature 1996 hourly hourly hourly hourly hourly
1997 hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly
Conductance 1996 hourly hourly hourly hourly hourly
1997 hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly hourly
-----------------------------------------------------------------------------------------------------------------------------------
Table 3c. Intensive Fixed Site sampling in the LINJ study unit, accomplishments through FY 1997.
Sampling frequency (fixed interval samples/event samples) for increasing urbanization site (fix2, eco1, int) 01403300 Raritan River at Queens Bridge.
--------------------------------------------------------------------------------------------------------------------
Sample Type Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Total
--------------------------------------------------------------------------------------------------------------------
Pesticides SC 2001 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Pesticides SC 2050 1996 0/2 0/1 1 0 0 4
1997 0/2 1 0/1 1 1 1 1/1 1/1 0/1 1/1 2 1 17
VOCs SC2020 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 2 1 1 1/1 1 0/1 1/1 1 1 16
Nutrients 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Suspended Sediment 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Suspended Organic Carbon 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Dissolved Organic Carbon 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Dissolved Solids 1996 0/2 0/1 1 1 1 6
1997 0/2 1 0/1 1 1 1 1/1 1/1 1/1 1/1 2 1 18
Temperature 1996
1997 hourly hourly hourly hourly hourly hourly
Conductance 1996
1997
--------------------------------------------------------------------------------------------------------------------